Works not Included
General Requirements
- Provision of a suitably locked space (around 20 mē/unit) for the storage of equipment and tools during installation (as may be defined in a subsequent schedule).
- Provision and eventual removal of scaffolding and any other protection of the work as may be required by the installation team and this for a duration defined in a subsequent schedule.
- Provision of adequate electrical power supply (EDL or generator) necessary for the installation from 7:30 a.m. to 5:30 p.m. without interruption.
- The equipment power-receiving panel and the electrical wiring for illumination, plus the power from it to the electrical room (adequate 1 or 3 phase MCB, details in layout drawings).
|
 |
|
|
|
|
 |
|
 |
|
|
|
|